SgT will perform this inspection when 3% to 5% of an order is ready, with the aim of identifying quality issues before a full production has been completed.
Main Controls Performed
Inspection of first pieces off the production lines
Ensuring that the first piece of the production line complies with customer’s expectations
Sampling across available styles, sizes and colors
Checks running back into the productions lines and at cutting and storage level